Preventive measure of structural strengthening

Preventive measure of structural strengthening: CFRP strengthening, steel plate strengthening, post installed anchoring.


Preventive measure of structural strengthening


Item

Common problems

Preventive measure
Post installed anchor

The glue is not full enough; the distance between the steel bar and the hole wall is uneven

Glue injecting gun is used to post installed anchor, and two times correction is made after steel bar is implanted. The length of exposed steel bar is reasonably reserved, and the difficulty of planting bar is reduced.
Externally bonded CFRP wrapThe bond is not firm; carbon fiber cloth is not soaked; hollowing, etc.

Strengthen the grinding of the base and brush the primer glue.

The carbon fiber cloth is soaked with carbon fiber adhesive glue and then paste.

Roll along the same direction, carbon fiber selvage suitable for more glue.

Pate steel plate

Hollowing

The steel plate and the concrete surface are evenly coated with steel plate adhesive.

Strictly control the thickness of the steel plate glue.

Pressure perfusion glue is used for construction.


produits recommandés

Vous pouvez trouver tout ce dont vous avez besoin ici, avoir confiance en essayant ces produits, vous trouverez la grande différence après cela.

Tissu unidirectionnel en fibre de carbone

HM-20 est un tissu de fibre de carbone unidirectionnelle. Lorsque mis en place par superposition d’épaisseurs du tissu sur la résine d’imprégnation époxyde HM-180C3P, il forme un système de renforcement composite.

Voir plus >

Adhésif de collage de plaque d'acier

Adhésif de renforcement structurel époxy modifié à deux composants pour la plaque d'acier collée au béton

Voir plus >

Back
Top
Close