Shanghai Ningguo Road Wharf Reinforcement

According to the design requirements, a grade I carbon fiber cloth is attached to the bottom of the dock tidal room.

Project Overview

Shanghai Ningguo Road Wharf is the old terminal before the founding of the People's Republic of China. Since the last century, it has been the responsibility of handling goods and loading and unloading goods. As time goes by, the concrete strength of the old wharf decreases, and it is immersed in the tidal water for a long time. The steel bars are exposed and rusted, which affects the durability and carrying capacity of the structure and needs to be reinforced.


Hardening time

2017


Reinforcement method

According to the design requirements, a grade I carbon fiber cloth is attached to the bottom of the dock tidal room.


Material selection

Shanghai Horse carbon fiber cloth


Shanghai Horse carbon fiber cloth strengthening wharf



Les produits utilisés dans ce projet.Les personnes qui ont parcouru ce projet concernent également ces produits:

Back
Top
Close