Shanghai Peace Hotel

strengthening with HM-500 injectable anchor adhesive

In the process of strengthening, after a series testing, finally decide to use HM-500 anchoring epoxy in part of the main structure.


Shanghai Peace Hotel 1.jpg


Project time: May. 2009


Project Add: Shanghai


Project type: Civil building

Shanghai Peace Hotel.jpg


Shanghai Peace Hotel 2.jpg


Project profile: The building was set up by main building and its ancillary building in south. Total area was 11697 m2. The main building is rectangle and from east to west length be 87.06m and the width from south to north be 21.25m.


The reason for reinforcing:

1> Historic building subsidence with its long term using period.

2> Increase the load

3> The original construction lack of steel bar


Strengthening material:

HM-500 injectable epoxy resin

anchor adhesive.jpg